Creek Restoration Tour today at 4!

All, A quick reminder that the Creek Restoration final tour is Today at 4PM. The time was originally scheduled for 5 but was pulled in a hour due to daylight savings time.


Hope to see you there.


Ringo

52 views0 comments

Recent Posts

See All

TLA Meeting Agenda for 5/5/21

TLA, Tenmile Lakes Association Meeting 5/05/2021 at Lakeshore Lodge, 6pm AGENDA Call to Order Board Roll Call and Introductions of members and guests Approval of minutes from 4/7/2021 President’s Repo

Boat Ramp Closure May 2021

PRESS RELEASE: April 27, 2021 BOAT RAMP CLOSURE - TENMILE COUNTY PARK- LAKESIDE, OR Tenmile County boat ramp (Lakeside, OR) will be closed to all traffic from 8am Monday, May 3rd to 4pm Tuesday, May 4

Creek Restoration Project Update April 2021

As of April 25, the lake level was at 7.81 feet. When at the Creek Restoration site, the water was still going over the top of the logs. The water level above the logs is approximately one foot higher