TLA Weed Barrier Project

TLA has built a new and improved weed barrier [from the original model created by Tenmile Lakes Basin Partnership] and deployed it in a test sight on Big Creek Arm. It is a 10'x10' reusable frame of 3" PVC drain pipe. We would like to thank TLBP for the membrane and the previous trials. If this is successful we hope to build some for consumer use this spring.


Alan Whitney



Weed Barrier Installation (see 10x10' square without weeds next to dock). Photo courtesy of Debbie Newman.

Recent Posts

See All

MEETING MINUTES - October 2020

TENMILE LAKES ASSOCIATION October MEETING 10.07.2020 Location: Lakeshore Lodge, Time: 6 pm ATTENDEES Alan Whitney, Debbie Newman, Julie Robbers, Dee Drummond, Greta Krost, Mike Shaw, John Reiss, Renee

MEETING MINUTES - September 2020

TENMILE LAKES ASSOCIATION September MEETING 9.2.20 Location: Lakeshore Lodge, Time: 6 pm ATTENDEES Alan Whitney, Blume Bauer, Debbie Newman, Julie Robbers, Ken Robbers, Dee Drummond, Greta Krost, Mike

PO Box 600

Lakeside, Oregon 97449

541-982-9829

© 2018 Tenmile Lakes Association

Website created by The Yellow Desk

  • Twitter - White Circle
  • Facebook - White Circle